Updated 2026-07-01

Cost of a Full Office Fit-Out in Pakistan

What to budget for a full office furniture fit-out in Pakistan — by headcount, room type, and spec tier, with PKR ranges for 2026.

Founders and admin leads ask for a single number for an office fit-out. There isn’t one — but there are honest bands for furniture-only projects in Pakistan. This guide turns headcount and room lists into PKR planning ranges for 2026, then shows where money actually concentrates.

Civil works, HVAC, and IT are out of scope here. Pair this with the office furniture price guide for category shopping and /corporate/ for process.

Per-person furniture budgets (2026)

Spec levelPer person (PKR)Includes
Lean startup55,000 – 85,000Desk, task chair, shared storage share
Mid corporate90,000 – 150,000Workstation system, ergo chair, meeting share, filing
Premium160,000 – 250,000+Veneer executive pieces, reception, boardroom

Room-by-room cost bands (furniture only)

Room / zoneLean (PKR)Mid (PKR)Premium (PKR)
Open-plan seat (desk+chair share of system)40,000 – 60,00070,000 – 110,000120,000 – 180,000
Manager office80,000 – 130,000140,000 – 220,000250,000 – 400,000
Director / partner office150,000 – 250,000280,000 – 420,000450,000 – 700,000+
Meeting room (6–8)120,000 – 180,000200,000 – 320,000350,000 – 550,000
Boardroom (10–12)200,000 – 320,000350,000 – 550,000600,000 – 950,000+
Reception + lounge120,000 – 200,000220,000 – 360,000400,000 – 650,000
Storage / utility40,000 – 80,00080,000 – 140,000150,000 – 250,000

Worked example: 20-person mid-spec office

Assumptions: 16 open-plan seats, 3 manager rooms, 1 director, one 8-seat meeting room, modest reception, basic filing.

LineQty logicMid estimate (PKR)
Workstation seats16 × ~95k blended desk+chair+panel share1,520,000
Manager rooms3 × ~180k540,000
Director office1 × ~350k350,000
Meeting room 8table + chairs260,000
Reception + loungecounter + sofa + visitors280,000
Storagefiling + wardrobe120,000
Furniture subtotal~3,070,000
Contingency 12%~370,000
Planning total~3.4M

Your number moves if the director suite goes Sheesham-heavy or if you add a second meeting room. City timing differs — see Lahore, Karachi, and Islamabad.

Headcount scenarios at a glance

HeadcountLean furnitureMid furniturePremium furniture
6–80.35M – 0.65M0.65M – 1.1M1.2M – 2.0M
12–150.7M – 1.2M1.2M – 2.2M2.2M – 3.5M
20–251.2M – 2.0M2.0M – 3.5M3.5M – 5.5M+
402.2M – 3.5M3.8M – 6.0M6.5M – 10M+

Figures are furniture-only PKR planning bands for 2026, not formal quotations.

Timeline and cash-flow planning

StageTypical durationCash note
Brief + measurements3–10 daysLittle spend
Spec + quote + samples1–3 weeksSample fees possible
Production2–6 weeksDeposit common
Freight + install3–12 days by cityBalance / staged payments

Phasing tip: install open plan first so the team can move in; stage reception and boardroom if cash is tight — but lock finishes early so phase 2 matches phase 1.

Process checklist

  1. Room list + headcount → corporate brief
  2. Category picks from the furniture hub
  3. Material choice (Sheesham vs laminate)
  4. Chair policy (ergonomic buying guide)
  5. Firm quote via contact

Price guides for pieces: tables, chairs, all furniture.

Civil vs furniture: keep the budgets separate

Mixing civil and furniture into one vague “fit-out number” hides overruns. Track two envelopes:

EnvelopeExamplesOwner
Civil / servicesPaint, flooring, HVAC, electrical pointsLandlord / contractor
FurnitureDesks, chairs, meeting, reception, storageFurniture workshop
IT / AVSwitches, APs, displays, cabling traysIT vendor

Furniture suppliers should not be blamed for missing floor boxes that civil never installed. Put dependencies in the project plan: power and data points before install day.

Brand and employer-brand spend that still counts as furniture

Reception counters, boardroom tables, and lounge seating are not vanity if you hire weekly or host clients. A useful split for mid firms:

  • 70–80% of furniture budget → staff seats and meeting utility
  • 20–30% → reception / boardroom brand surfaces

If brand spend exceeds 40% while staff still sit on non-adjustable chairs, invert the ratio.

Risk register for furniture projects

RiskSignalMitigation
Spec driftVerbal changes after quoteChange orders in writing
Access failureNo goods liftPre-install site check
Finish mismatchPhased buyingLock laminate codes day one
Under-seating meetingsCheap visitor countPeak occupancy math
Delayed depositProduction not startedAlign cash with lead time

Write these into the kickoff note when you start a corporate brief.

FAQ

How much does a full office fit-out cost in Pakistan?
Furniture-only fit-outs in 2026 often run PKR 70,000–150,000 per person for mid-spec open plan, excluding civil works, AC, and IT cabling. Lean floors can dip near PKR 55,000–85,000 per person; premium veneer-heavy floors often exceed PKR 160,000–250,000 per person.
What is usually excluded from furniture quotes?
Partitions (if civil), flooring, paint, networking, AV, soft furnishings beyond contracted SKUs, and sometimes delivery into buildings without goods lifts.
How long does a furniture fit-out take?
After specs are locked, workshop production for a mid floor is often 2–6 weeks depending on quantity and customization, plus city freight and install windows. Complex reception and boardroom packages add time.
Should I budget contingency?
Yes. Keep 10–15% for site surprises: damaged goods lifts, after-hours labor, extra cable modules, or last-minute seat adds.
Is per-person budgeting accurate for mixed offices?
It is a planning tool. Director suites and boardrooms inflate averages. Build a room list first, then roll up — do not multiply headcount by a premium rate if most seats are open plan.
Can startups phase the spend?
Yes. Phase 1: staff desks and chairs. Phase 2: meeting and reception. Phase 3: executive upgrades. Just keep finishes consistent so phases do not look mismatched.